Servicing that keeps it ready.
A generator is only worth having if it runs on the one night you need it. We service and test it so it does, and you get a written report every visit.
Three ways to keep it ready.
Pick what suits how your generator is used. Every option is quoted for your generator, so you know the cost before we start.
| One-off serviceYou just need it done. | Standby planFor backup generators that sit and wait: farms, cold rooms, offices, homes. | Prime power planFor generators that run every day. | |
|---|---|---|---|
| Oil and filter service | Once | Every 12 months | By run hours |
| Inspection and test run | With the service | Every 6 months | Every visit |
| Load bank test | Add it if you want it | Every 12 months | Every 12 months |
| Transfer switch and blackstart test | Add it if you want it | Every 12 months | Where one is fitted |
| Written report | |||
| We book the visits and remind you | Not included | ||
| Front of the queue for breakdowns | Not included |
One-off service
You just need it done.
- Oil and filter service
- Inspection and test run
- Written report
- Add a load bank or transfer switch test if you want one
Standby plan
For backup generators that sit and wait: farms, cold rooms, offices, homes.
- Inspection and test run every 6 months
- Oil and filter service every 12 months
- Load bank test every 12 months
- Transfer switch and blackstart test every 12 months
- Written report each visit
- We book the visits and remind you
- Front of the queue for breakdowns
Prime power plan
For generators that run every day.
- Oil and filter service by run hours
- Inspection and test run every visit
- Load bank test every 12 months
- Written report each visit
- We book the visits and remind you
- Front of the queue for breakdowns
For plan customers, we'll set up a schedule of fees with you before any work starts, so there are no surprises on an invoice.
The work, then the proof.
On a service
- Engine oil and oil filter changed
- Fuel filter and air filter replaced
- Coolant, belts and hoses checked
- Start battery tested, and replaced when it's due
- Controller, alarms and safety shutdowns checked
On a test
- Load bank test up to full rated load
- Automatic transfer switch tested
- Blackstart test: we drop the mains and watch it take over
- Thermal imaging of switchboards and connections
- Generator
- 100 kVA diesel, standby
- Test
- Load bank, stepped to full rated load
| Load | kW | Min | Hz | Coolant |
|---|---|---|---|---|
| 25% | 20 | 15 | 50.1 | 74°C |
| 50% | 40 | 15 | 50.0 | 80°C |
| 75% | 60 | 30 | 50.0 | 84°C |
| 100% | 80 | 60 | 49.9 | 88°C |
Every visit ends with a written report: what we did, what the readings were, and anything to fix before it becomes a breakdown.
Generators and controllers we work on.
- Cummins
- ComAp
- Deep Sea Electronics
Got a different make? Call and ask.
About servicing.
How often should a standby generator be serviced?
On our standby plan it gets an inspection and test run every 6 months, and an oil and filter service, a load bank test and a transfer switch test every 12 months.
What about a generator that runs every day?
That's prime power. It's serviced by run hours, with an inspection and test run every visit.
Will I know the cost before you start?
Yes. Every option is quoted for your generator. Plan customers get a schedule of fees before any work starts.
Do I have to remember to book it?
Not on a plan. We book the visits and remind you.
What do I get at the end?
A written report: what we did, what the readings were, and anything to fix before it becomes a breakdown.
Other generator work.
Call, or send us the details.
0472 590 563Monday to Friday, 7am to 5pm. Breakdown callouts after hours. Brisbane and South East Queensland.